Hoses and valves
NOTEDUNKNOWNCONFIRM
Day plan / Guide 36
Sharon 02067
Tie floor or standpipe water to fill, wash, pump-out, and connections.
Tie water on the floor or at the standpipe to the machine stage and note the hot and cold connections.
Call and make a plan 877-702-1610Symptom cards
Service path
Keep the appliance in place unless a qualified person moves it safely, and divide plumbing from appliance and electrical service.
Prepare and restore
Retain the cycle observation, connection work, drain result, floor condition, and any unresolved appliance issue.