Filling
NOTEDUNKNOWNCONFIRM
Day plan / Guide 39
Sharon 02067
Separate filling, draining, overflow, spray, enclosure, and room-below paths.
Keep filling, draining, overflow, and shower-spray observations separate and stop any test that spreads water.
Call and make a plan 877-702-1610Symptom cards
Service path
Ask how the inspection distinguishes drain, waste and overflow, supply, enclosure, and concealed routes before finishes open.
Prepare and restore
Record the exact test, finding, access, repair, drying boundary, and surfaces left unexamined.